Standard metrics like power usage effectiveness (PUE) and water usage effectiveness (WUE) ignore carbon intensity in the local electricity grid. That means a higher-PUE facility that runs on low-carbon hydro power can be greener than chasing low PUE through water-intensive cooling.
That’s the view of Mauro Leuce, senior director of global design and engineering standards at Digital Realty, who spoke to Computer Weekly at Schneider Electric’s datacentre cooling equipment assembly site in Conselve, Italy.
In the interview, Leuce also spoke about why modern datacentre cooling avoids water loss and treats closed-loop liquid “like gold”. And that changes in datacentre outage protection and grid operator requirements to stay connected mean diesel generators are giving way to batteries on-site.
Why does the way the industry talks about water matter, and what is efficiency really about?
Stating simply that we don’t use water may be counterproductive, because then we lose trust. For me, my very first mission should be creating trust in communities, because if they understand how the datacentre works, that will help both of us.
If I don’t sell efficiencies to my customer, nobody will come to Digital Realty to lease a space, so efficiency is quite an important factor when the customer selects their sites.
Being efficient is one of our top priorities. At the moment, most technologies try to ensure you transfer heat as fast as possible to the outside. What has not been done in a large-scale deployment is to explore what else you can do with heat that has been extracted, such as heat reuse and district heating.
What do customers ask about efficiency, and is PUE the right measure?
At the moment, PUE and WUE are the two parameters that put a facility on a scale from bad to good. However, those two parameters are not the only ones that can give a true indication of how efficient a facility is, because a facility on paper may have a higher PUE, but the carbon intensity of the grid is low, such as in Norway and Finland, for example, because they use a lot of hydroelectric power.
“The cost of purifying liquid in the technology cooling system is so high that the last thing you want is to lose that water or constantly refill. We are using laboratory-grade stainless steel pipework, leak-proof valves, and so on. If there is leakage, it will be a big issue, so water is treated like gold”
Mauro Leuce, Digital Realty
PUE is just a ratio. It’s a number with no unit of measurement, and it’s the ratio between energy used overall and the energy utilised by the IT equipment. So, having as low energy as possible tells you how efficiently that is done.
But I could achieve efficient cooling using water, by evaporative cooling. It’s very efficient because you practically use the water to evaporate and cool down without using any energy. So, there is a trade-off between water and electricity, but it all depends on carbon intensity.
Is anyone building evaporative water-loss systems now?
No, it’s becoming uncommon, mainly because of the cost associated with water treatment. So having water sprayed on the chillers before evaporative cooling requires pH control, acid dosing, etc. Our position in EMEA is you stick with the air-cooled free-cooling chiller and that’s it. There’s no point investing in adiabatic as a plan B or whatever.
What do Digital Realty’s customers actually demand around efficiency in energy and water?
They ask, what is your PUE? What is your WUE? If you use water or not? Because they also have their environmental commitments. I don’t know if you saw that there’s been a Royal Decree mandating 1.15 PUE in Madrid. They are still reconsidering that statement because the only way to achieve those numbers would be to use water, but you don’t want that in a water-stressed region like Madrid.
How much water does a site actually draw?
We only ask for a water connection for our toilets, the sprinkler system, the services to refill the closed loop and whatever. So in reality, our connection is no different than a normal factory. The cost of purifying liquid in the technology cooling system is so high that the last thing you want is to lose that water or constantly refill. We are using laboratory-grade stainless steel pipework, leak-proof valves, and so on. If there is leakage, it will be a big issue. So for us, water is treated like gold, or even more than gold.
How is backup power changing?
That is by contract, depending on the customers. The basic requirement for any datacentre, if you follow the Uptime Institute recommendations, is always 12 hours of fuel storage.
But now customers are starting to ask to change service level agreements, to the point where they will be willing to not have generators on site because they can rely on active-active workloads. That’s where one workload is run in two different facilities at the same time, so that if one datacentre goes down, you still have plan B.
There will still be a portion of generators installed for basic emergency services such as the network room. The network spine needs to be still there for X number of hours, which will be agreed with the customers.
But there is a shift from having on-site generator backup, which was the de facto standard until a few years ago. Now there is a shift to installing battery energy storage systems, with the reason coming from the utility grid requirements.
The grid now asks us to stay connected, even when there are disturbances on the grid, which means we have to continue to operate and stay connected, even if there are very large dips in voltage and frequency.
To do that, the only way is utilising battery energy storage systems called grid-forming [methods to establish and stabilise grid voltage and frequency rather than just passively follow them]. They can control the voltage and stabilise it. Generators are now practically obsolete, because the utility asks us to stay connected, when usually before we were disconnecting and going generator-only.